R40165 Pre-Owned GNER Mk4 Open First Coach M 11417 Paint Completed at Darlington Works and
Description
Completed at Darlington Works and entering traffic on 26th January 1938
with 9 track layouts which includes a loop-the-loop and half pipe
Working head lamp
Headlights can be directional or independently controlled (depending on decoder)
Its guidance system was classed as a semi-active radar homing system
R40165 Pre-Owned GNER Mk4 Open First Coach M 11417 Paint Completed at Darlington Works andPre Owned Item, in as new condition. Accessory Pack Included. Built at Metro Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
You may also like
US$ 32.50
US$ 140.00
US$ 220.00
US$ 21.00
US$ 35.00
US$ 21.00





